The problem

Finance is asked to bless an AE OTE and quota without putting cost of sales next to attainment, so a 50/50 plan at 5x quota looks fine at 100% while 80% already eats the ceiling, or a 25% cost-of-sales target is treated as safe when it sits below the commission rate and is never reachable.

Copy, paste, run

Run it in your LLM

One prompt for Claude or ChatGPT that puts an AE compensation plan on the same unit: OTE vs bookings at the attainment you enter, cost of sales at 50 through 150%, and the attainment below which the ceiling breaks. Type run the example after pasting it to test it on the fictional data built into the prompt.

Download .mdSKILL.mdExample CSV
# Sales comp cost of sales: OTE vs quota at different attainment

You are a CPA sitting with a senior ops leader. Decide what an AE compensation plan costs as a percent of bookings at different attainment, and the attainment below which cost of sales breaks the ceiling they set.

This page is OTE vs bookings on one AE plan. Paying the right commission against billing is on the commission-accuracy playbook. Whether quota is realistic is on the quota-attainment playbook. Do not invent cost-of-sales or quota-to-OTE benchmarks. A common rule of thumb is 4-5x quota to OTE; call that a rule of thumb, not a sourced stat.

## Rules

- Use only the data in this conversation. Do not invent OTE, splits, quotas, attainment, accelerators, or cost-of-sales ceilings. If something is missing, ask for it, or use the fallback this prompt defines and label it as an assumption.
- Run the calculations in code if you can. If you cannot run code, say so at the top and show the working.
- Show the formula next to every headline number.
- Round money to the nearest dollar. Round the commission rate, quota-to-OTE multiple, and break-even attainment to one decimal. Round cost of sales to two decimals (show 20.0% when the hundredth is 0, 19.17% when it is not).
- The example inputs are fictional. Label every output that uses them "Example data (fictional)". They are not a comp or attainment benchmark.
- Linear below 100% attainment. No decelerators and no cap. Accelerators apply only above quota.
- This is OTE vs bookings, not fully loaded cost of sales. Benefits, employer tax, and manager cost are out. Say that plainly.
- Read only. Do not change HRIS, payroll, or CRM records. Report what the numbers imply and leave the plan decision to the user.

## Definitions

- OTE is on-target earnings for one AE, in one currency, for one year.
- Base percent is the salary share of OTE. 50 means 50/50. Variable = OTE x (1 - base%).
- Quota is annual bookings quota for that AE.
- Attainment is bookings / quota, as a percent. 100 means 100%.
- Accelerator is the multiplier on the commission rate for bookings above quota. 1.5 means 1.5x. It does not apply at or below 100%.
- Max cost-of-sales target is total comp / bookings they will not exceed. 25 means 25%.
- Commission rate = variable / quota.
- Bookings = quota x attainment.
- Payout at or below 100% = rate x bookings. Payout above 100% = variable + rate x accelerator x (bookings - quota).
- Total comp = base + payout. Cost of sales = total comp / bookings. Do not divide by zero.
- Quota-to-OTE multiple = quota / OTE.
- Break-even attainment for the target = base / ((target - rate) x quota). Only valid when target > rate. If target is at or below the commission rate, write exactly: target below commission rate, never reachable.
- Show cost of sales at 50%, 80%, 100%, 120%, and 150% attainment on the same plan.

## Step 0. Inputs

If the user says "run the example", use the EXAMPLE DATA section at the end of this prompt, do not ask any questions, and label every output "Example data (fictional)".

Otherwise ask for everything below in one message, skipping anything the user already gave:

1. A CSV of scenarios, one row per AE plan, with these columns (ask the user to map theirs):
   - scenario (id, for example 2026-q3), ote, base_pct, quota, attainment_pct, accel, max_cos_pct
   Where to get it: the signed plan for OTE, split, quota, and accelerator; CRM or finance for current attainment; finance for the cost-of-sales ceiling. Percents are 50 for 50%. Accelerator is 1.5 for 1.5x.
2. Which scenario to score. Default: the last kept row.

Then report a data check: rows read; rows left out and why (duplicate scenario, no scenario id, inputs not numbers, a count or rate that cannot be used); scenarios kept. Ask the user to confirm before going on, unless they said "run the example".

## Step 1. Score the plan

Compute rate, quota-to-OTE, bookings, payout, total comp, and cost of sales at the scored attainment. Then the five-point table at 50/80/100/120/150%. Then break-even attainment for the ceiling.

Then a short qualitative section, not a score:

- Linear below quota, accelerators only above, no decelerators, no cap.
- Fully loaded benefits and employer tax are excluded.
- A 4-5x quota-to-OTE multiple is a rule of thumb, not a sourced stat.

## Step 2. Output

Start with a five-line summary:

- Headline: "At {attainment}, cost of sales is {cos} on {bookings} bookings ({comp} total comp)."
- Rate and multiple: "Commission rate {rate}. Quota-to-OTE {multiple}."
- Above or below quota: "{payoutLine}."
- Break-even: "Ceiling {target}: {breakEven}."
- One line: "OTE vs bookings, not fully loaded cost of sales. Linear below 100%, no decelerators, no cap. {excluded} rows were left out. Example inputs, not benchmarks."

Then these tables:

1. Data check
2. Scored scenario (inputs, rate, multiple, bookings, payout, total comp, cost of sales)
3. Cost of sales at 50/80/100/120/150% attainment (bookings, payout, total comp, cost of sales)
4. Break-even attainment for the ceiling, or the never-reachable line
5. Assumptions, each labeled as an assumption, including: linear below quota, accelerators only above, no cap, OTE not fully loaded; commission accuracy and quota realism live on their own playbooks.

If you can create files, offer the scored row as a CSV download.

## EXAMPLE DATA (fictional, for testing this prompt)

Use this only when the user says "run the example". The company and plans are made up. Every figure is an example input to replace, not a comp or attainment benchmark.

- Score 2026-q3
- OTE $150,000
- Base / variable 50/50
- Annual quota $750,000
- Attainment 100%
- Accelerator above 100% 1.5x
- Max cost-of-sales target 25%

Scenarios:

```csv
scenario,ote,base_pct,quota,attainment_pct,accel,max_cos_pct
2026-q2,140000,50,700000,90,1.5,25
2026-q3,150000,50,750000,100,1.5,25
2026-q3,150000,50,750000,100,1.5,25
BAD-1,0,50,750000,100,1.5,25
,150000,50,750000,100,1.5,25
```

How to run it

  1. Open Claude or ChatGPT with code execution on (Claude's analysis tool, ChatGPT data analysis). Without it the model does arithmetic by hand, and you should check every number.
  2. Paste the prompt. To test it first, send "run the example" and compare with the expected results below.
  3. Attach a CSV of plans with scenario, ote, base_pct, quota, attainment_pct, accel, and max_cos_pct. The prompt lists the columns.
  4. Read the data check first. Take commission rate, cost of sales, the five-point table, and break-even attainment to the plan review. Keep every figure labeled as an example input, not a comp or attainment benchmark.

Before you paste OTE, quota, and attainment

Comp plans, quotas, and attainment are commercially sensitive. Check your company's AI and data policy, prefer a business or enterprise plan, and drop rep names: the prompt only needs scenario ids and amounts. It reads the extract and changes nothing in HRIS, payroll, or the CRM.

Expected results on the example data

A correct run of "run the example" should match these, give or take rounding. They are computed from the prompt's definitions by a reference implementation that is tested against hand-worked numbers. The data is fictional.

Data check
5 rows; kept 2026-q2, 2026-q3; left out: 2026-q3 (duplicate scenario), BAD-1 (Enter an OTE above zero.), (blank scenario) (no scenario id)
Rate and multiple
10.0% commission rate; 5.0x quota-to-OTE
At scored attainment
$750,000 bookings, $150,000 total comp, 20.0% cost of sales
Break-even
$500,000 bookings = 66.7% attainment for a 25% ceiling
Expected cost of sales by attainment
AttainmentBookingsTotal compCost of sales
50.0%$375,000$112,50030.0%
80.0%$600,000$135,00022.5%
100.0%$750,000$150,00020.0%
120.0%$900,000$172,50019.17%
150.0%$1,125,000$206,25018.33%

Rate 10.0%, quota/OTE 5.0x. 100% -> $750,000 bookings, $150,000 comp, 20.0%. 80% -> 22.5%. 120% -> $172,500, 19.17%. Break-even at 25%: $500,000 = 66.7%. 50% -> 30.0%. 150% -> $206,250, 18.33%. Example inputs, not benchmarks.

Sales comp cost of sales (OTE vs quota)

What an AE plan costs as a percent of bookings at the attainment you enter, and the attainment below which cost of sales breaks your ceiling. Linear below 100%, accelerators only above, no decelerators, no cap. Every field is an example input to replace. Prefilled with the fictional example.

Commission rate
10.0%
Variable $75,000 / quota
Quota-to-OTE multiple
5.0x
$750,000 / $150,000
Bookings
$750,000
$750,000 x 100.0%
Variable payout
$75,000
Rate x bookings, at or below quota
Total comp
$150,000
Base $75,000 + payout
Cost of sales
20.0%
Total comp / bookings
Break-even attainment
66.7%
$500,000 bookings = 66.7% attainment
Base pay
$75,000
$150,000 x 50.0%

Cost of sales at 50 / 80 / 100 / 120 / 150% attainment

Same plan, those five attainment points. OTE, split, quota, accelerator, and ceiling stay as entered.

AttainmentBookingsPayoutTotal compCost of sales
50.0%$375,000$37,500$112,50030.0%
80.0%$600,000$60,000$135,00022.5%
100.0%$750,000$75,000$150,00020.0%
120.0%$900,000$97,500$172,50019.17%
150.0%$1,125,000$131,250$206,25018.33%

What this cost-of-sales math leaves out

  • Plan shape. Linear below 100%. No decelerators, no cap, no SPIFs, draws, or team overrides. Accelerators apply only above quota.
  • One AE, one year. Fully loaded benefits, employer tax, and manager cost are out. This is OTE vs bookings, not fully loaded cost of sales.
  • Quota-to-OTE. A common rule of thumb is 4-5x quota to OTE. That is a rule of thumb, not a sourced stat. Replace the example with your plan.

Tool cost vs bookings on one AE plan, not a payroll file. Paying the right amount against billing is on the commission accuracy playbook. Whether the quota itself is realistic is on quota attainment. Every default is an example input, not a benchmark.

Implementation steps

  1. 1

    Write the definitions down with finance and sales ops before pulling numbers: OTE is on-target earnings for one AE for one year; base percent is the salary share of OTE; quota is annual bookings; attainment is bookings / quota; accelerator multiplies the commission rate only above 100%; max cost of sales is total comp / bookings they will not exceed. Linear below 100%, no decelerators, no cap. Every figure is an input you replace, not a comp benchmark. Paying the right amount against billing is a different question, on the commission-accuracy playbook; whether the quota is realistic is on the quota-attainment playbook

  2. 2

    Collect one row per AE plan. Drop rows with a missing scenario id, a duplicate scenario, an OTE or quota of zero, a base percent or ceiling outside 0% to 100%, or a negative attainment or accelerator, and list each dropped row

  3. 3

    Base = OTE x base%. Variable = OTE x (1 - base%). Commission rate = variable / quota. Quota-to-OTE = quota / OTE. In the fictional example $150,000 OTE, 50/50, $750,000 quota: variable $75,000, rate 10.0%, multiple 5.0x. A common rule of thumb is 4-5x quota to OTE; that is a rule of thumb, not a sourced stat

  4. 4

    Bookings = quota x attainment. Payout at or below 100% = rate x bookings. Payout above 100% = variable + rate x accelerator x (bookings - quota). Total comp = base + payout. Cost of sales = total comp / bookings. In the fictional example 100% -> $750,000 bookings, $150,000 comp, 20.0%. 80% -> $600,000, payout $60,000, comp $135,000, 22.5%. 120% -> $900,000, payout $97,500, comp $172,500, 19.17%. Round money to the nearest dollar, rate and multiple to one decimal, cost of sales to two decimals

  5. 5

    Break-even attainment for the ceiling = base / ((target - rate) x quota), only when the target is above the commission rate. In the fictional example 25%: $75,000 / ((0.25 - 0.10) x $750,000) = $500,000 bookings = 66.7%. If the target is at or below the rate, write "target below commission rate, never reachable". Round break-even attainment to one decimal

  6. 6

    Show cost of sales at 50%, 80%, 100%, 120%, and 150% on the same plan. In the fictional example 50% -> $375,000 bookings, $112,500 comp, 30.0%; 150% -> $1,125,000, payout $131,250, comp $206,250, 18.33%. Say that benefits, employer tax, and manager cost are out; this is OTE vs bookings, not fully loaded cost of sales

  7. 7

    Run it with the copy-paste prompt on this page in Claude or ChatGPT, or with formulas in the template, and use the calculator on this page to test other OTEs, splits, quotas, accelerators, and ceilings. Share rate, cost of sales at the scored attainment, the five-point table, and break-even attainment with finance; this is plan math, not a payroll file and not a quota-setting vote

  8. 8

    Rerun when OTE, split, quota, accelerator, or the cost-of-sales ceiling changes, and store the six inputs so a lower attainment shows up before the plan is signed

Template outline

The structure to recreate in your own workspace. Field names and thresholds are starting points.

Google Sheet: AE cost of sales FYxx (finance owns the ceiling; sales ops owns OTE and quota)

Tab inputs: score_scenario

Tab plans (one row per AE plan):
  scenario, ote, base_pct, quota, attainment_pct, accel, max_cos_pct
  kept = unique scenario AND all fields are numbers AND ote > 0 AND quota > 0
    AND base_pct and max_cos_pct in [0, 100] AND attainment_pct >= 0 AND accel >= 0

Tab comp:
  base = ote x base_pct / 100
  variable = ote x (1 - base_pct / 100)
  rate = variable / quota
  quota_to_ote = quota / ote
  bookings = quota x attainment_pct / 100
  payout = IF(attainment_pct <= 100, rate x bookings, variable + rate x accel x (bookings - quota))
  total_comp = base + payout
  cost_of_sales = total_comp / bookings
  break_even_bookings = IF(max_cos_pct / 100 > rate, base / (max_cos_pct / 100 - rate), "never")
  break_even_attainment = break_even_bookings / quota

Tab table (50, 80, 100, 120, 150):
  same formulas, attainment_pct from the row

Worked example (example data, fictional): score 2026-q3
  5 rows read, 2 kept (2026-q2 and 2026-q3). Left out: 2026-q3 listed twice; BAD-1 OTE 0; blank scenario.
  $150,000 OTE, 50/50, $750,000 quota. Rate 10.0%. Quota/OTE 5.0x.
  100%: $750,000 bookings, $150,000 comp, 20.0% cost of sales.
  80%: $600,000, payout $60,000, $135,000, 22.5%.
  120%: $900,000, payout $97,500, $172,500, 19.17%.
  Break-even at 25%: $500,000 = 66.7%.
  50%: $375,000, $112,500, 30.0%. 150%: $1,125,000, payout $131,250, $206,250, 18.33%.
  Inputs are examples to replace, not benchmarks.
  4-5x quota-to-OTE is a rule of thumb, not a sourced stat.

Calculator on this page, prefilled: $150,000, 50%, $750,000, 100%, 1.5x, 25%. Every money line above matches.

Slack to #finance-revenue before the plan is signed:
"AE cost of sales ({{scenario}}): rate {{rate}}, {{cos}} on {{bookings}} ({{comp}}).
 Break-even {{break_even}} for a {{target}} ceiling. Quota/OTE {{multiple}}.
 OTE vs bookings, not fully loaded. Linear below 100%, no cap. Sheet: {{sheet_url}}"

Tab history: scenario, ote, quota, attainment, bookings, total_comp, cost_of_sales, break_even

Cost, time saved, and break-even

Tool cost here is your share of an LLM plan, which depends on your vendor, so it is an input. Every number below is an example input; replace each with your own figure. Hours saved are estimates, not measured results. The OTE, split, quota, attainment, accelerator, and ceiling in the calculator are also example inputs, not benchmarks.

Inputs (all assumptions)

Replace each value with your own figure.

  • THours a quarter to pull OTE, split, quota, attainment, accelerator, and the cost-of-sales ceiling and size the plan by hand4AssumptionTime the next three plan reviews.
  • VHours a quarter with the prompt or template (export, review the data check and the results)0.8AssumptionTime the first two quarterly runs, then multiply by three for the quarter.
  • RLoaded hourly cost of the finance or RevOps analyst$75AssumptionSalary plus benefits, divided by working hours.
  • KMonthly tool cost for the LLM plan$20AssumptionYour share of the Claude or ChatGPT plan, from current vendor pricing and your invoices; Google Sheets, the CRM, and Slack are usually already paid for.

Formulas

Time saved per quarter (estimate)T - V
4 - 0.8 = 3.2 hours
Time saved per week (estimate)(T - V) / 13
3.2 / 13 = 0.2 hours
Value of time saved per quarter (estimate)(T - V) x R
3.2 x $75 = $240
Tool cost per quarterK x 3
$20 x 3 = $60
Break-even hours per quarter (estimate)K x 3 / R
$60 / $75 = 0.8 hours, so the run covers its tool cost once it saves 48 minutes a quarter
Cost of sales (fictional example data)total comp / bookings; break-even attainment = base / ((target - rate) x quota)
At 100%: $150,000 / $750,000 = 20.0%. At 80%: 22.5%. At 120%: 19.17%. Break-even at 25%: 66.7%
  • The time math counts analyst time only and is an estimate. Changing the signed plan is a much larger number, but that decision is yours, so it is not added to the time savings.
  • Rounded dollars are not a payroll file. Recheck when OTE, quota, accelerator, or the ceiling changes.
  • Rerun the time math after the first two quarters with your real review time V.

Common questions

How do you compute cost of sales on an AE compensation plan?
Cost of sales here is total comp / bookings. Base = OTE x base%. Variable = OTE x (1 - base%). Rate = variable / quota. Payout at or below quota is rate x bookings; above quota it is variable plus rate x accelerator x overage. In the fictional example $150,000 OTE, 50/50, $750,000 quota at 100%: rate 10.0%, bookings $750,000, comp $150,000, cost of sales 20.0%.
At what attainment does cost of sales break a 25% ceiling?
Break-even attainment = base / ((target - rate) x quota), only when the target is above the commission rate. In the fictional example $75,000 / ((0.25 - 0.10) x $750,000) = $500,000 bookings = 66.7%. If the target is at or below the rate, it is never reachable.
What is a typical quota-to-OTE multiple?
Quota-to-OTE = quota / OTE. In the fictional example $750,000 / $150,000 = 5.0x. A common rule of thumb is 4-5x; that is a rule of thumb, not a sourced stat. Replace the example with your signed plan.
Does this include accelerators, decelerators, and benefits?
Accelerators apply only above 100%. The sheet is linear below quota, with no decelerators and no cap. Benefits, employer tax, SPIFs, draws, and manager cost are out. This is OTE vs bookings, not fully loaded cost of sales.
How much time does it save?
With the example inputs, building the comparison by hand takes 4 hours a quarter and reviewing the prompt or template run takes 0.8, so 3.2 hours a quarter are saved, about 0.2 hours a week. That is an estimate, worth $240 a quarter at $75 an hour against an example $60 a quarter LLM plan share.

Same kind of money math, with the formulas shown. Each opens in the browser with example inputs you replace.