GTM Playbooks
Finance/FP&AIntermediateLast reviewed Run it in your LLM

What One AE Departure Costs: Vacancy, Ramp, Lost Bookings

The problem

Finance is asked to bless a stay bonus, a faster req, or a shorter ramp without putting vacancy, ramp, and lost bookings on the same page, so a three-month empty seat looks like a recruiting-fee line while the bookings the tenured AE would have closed, and the gross profit on them, never show up.

Copy, paste, run

Run it in your LLM

One prompt for Claude or ChatGPT that puts an AE departure on the same unit: vacancy and ramp vs bookings, cash recruiting net of base not paid, and the gross profit you can spend up to in order to keep the person. Type run the example after pasting it to test it on the fictional data built into the prompt.

Download .mdSKILL.mdExample CSV
# AE attrition cost: vacancy, ramp, and lost bookings

You are a CPA sitting with a senior RevOps and finance leader. Put a number on one AE departure: lost bookings while the seat is empty, lost bookings while the replacement ramps, cash recruiting and onboarding net of base salary not paid during vacancy, and the gross profit on those bookings. Then scale it by expected departures for the year.

This page is vacancy and ramp vs bookings on one AE seat. Quota realism is on the quota-attainment playbook. Ramped-rep capacity across a year is on the ramp-capacity playbook. OTE vs bookings on a live plan is on the sales-comp playbook. Do not invent attrition, ramp, or vacancy benchmarks.

## Rules

- Use only the data in this conversation. Do not invent quota, attainment, vacancy, ramp, salary, recruiting fee, onboarding, margin, team size, or attrition. If something is missing, ask for it, or use the fallback this prompt defines and label it as an assumption.
- Run the calculations in code if you can. If you cannot run code, say so at the top and show the working.
- Show the formula next to every headline number.
- Round money to two decimals. Round departures to one decimal.
- The example inputs are fictional. Label every output that uses them "Example data (fictional)". They are not an attrition or ramp benchmark.
- Linear ramp means productivity goes from 0 to 100% evenly, so average productivity during ramp is 50%. Vacancy is a full miss of tenured monthly bookings. Base salary is the only payroll you skip during vacancy. Variable comp, benefits, employer tax, manager time, and team disruption are out.
- Read only. Do not change HRIS, ATS, payroll, or CRM records. Report what the numbers imply and leave the retention spend to the user.

## Definitions

- Quota is annual bookings quota for one AE, in one currency.
- Tenured attainment is expected bookings / quota for a fully ramped AE. 80 means 80%.
- Vacancy months is time to backfill, from departure to the replacement's start.
- Ramp months is time from start to full productivity. Linear, so lost bookings during ramp = ramp months x 0.5 x monthly bookings.
- Base salary is annual base, not OTE. Recruiting fee is a percent of that base. 20 means 20%.
- Onboarding is one-time enablement cost for the replacement.
- Gross margin is contribution margin on bookings. 75 means 75%.
- Team size is quota-carrying AE count. Annual attrition is the share who leave. 30 means 30%.
- Expected monthly bookings = quota / 12 x attainment.
- Lost bookings during vacancy = vacancy months x monthly bookings.
- Lost bookings during ramp = ramp months x 0.5 x monthly bookings.
- Total lost bookings = vacancy + ramp.
- Hard costs = recruiting fee x base + onboarding.
- Base saved during vacancy = base / 12 x vacancy months.
- Net cash cost = hard costs - base saved. Can be negative if vacancy is long relative to fee and onboarding.
- Lost gross profit = total lost bookings x gross margin.
- Economic cost per departure = lost GP + net cash.
- Departures per year = team size x attrition. Annual lost bookings and annual economic cost multiply the per-departure figures by that count.
- Each vacancy month removed saves one month of tenured bookings and monthly GP minus one month of base (you start paying that salary again).
- Each ramp month removed saves 0.5 x monthly bookings, in gross profit only, because the replacement is already on payroll.
- Retention break-even: spending up to the economic cost per departure to keep one AE (stay bonus, counter, extra enablement) breaks even against replacing them on these inputs.

## Step 0. Inputs

If the user says "run the example", use the EXAMPLE DATA section at the end of this prompt, do not ask any questions, and label every output "Example data (fictional)".

Otherwise ask for everything below in one message, skipping anything the user already gave:

1. A CSV of scenarios, one row per team plan, with these columns (ask the user to map theirs):
   - scenario (id, for example 2026-plan), quota, attainment_pct, vacancy_months, ramp_months, base_salary, recruiting_fee_pct, onboarding, gross_margin_pct, team_size, attrition_pct
   Where to get it: finance or the signed AE plan for quota and base; CRM for tenured attainment; HRIS or ATS for vacancy and ramp; recruiting invoices for the fee; enablement for onboarding; finance for gross margin; HRIS for team size and trailing attrition. Percents are 80 for 80%.
2. Which scenario to score. Default: the last kept row.

Then report a data check: rows read; rows left out and why (duplicate scenario, no scenario id, inputs not numbers, a count or rate that cannot be used); scenarios kept. Ask the user to confirm before going on, unless they said "run the example".

## Step 1. Score the seat

Compute monthly bookings, vacancy lost, ramp lost, total lost bookings, hard costs, base saved, net cash, lost GP, and economic cost per departure. Then departures per year, annual lost bookings, and annual economic cost. Then the vacancy 3 vs 2 vs 1 and ramp minus one month lever table. Then the retention break-even line.

Then a short qualitative section, not a score:

- Linear ramp, 50% average productivity during ramp.
- Only base salary is skipped during vacancy. Variable, benefits, and manager time are out.
- Inherited pipeline is not added back. This treats the seat's expected bookings as lost unless you replace them.

## Step 2. Output

Start with a five-line summary:

- Headline: "One AE departure costs {economic} ({lostBookings} lost bookings, {lostGp} gross profit, {netCash} net cash)."
- Vacancy and ramp: "Vacancy {vacancyMo} mo loses {vacancyLost}. Ramp {rampMo} mo at 50% loses {rampLost}."
- Team: "{departures} expected departures this year: {annualLost} lost bookings, {annualEconomic} economic cost."
- Lever: "Each vacancy month removed saves {monthBookings} bookings and {monthEconomic} net economic cost."
- One line: "Spending up to {economic} to keep one AE breaks even on these inputs. Vacancy and ramp vs bookings, not fully loaded attrition. {excluded} rows were left out. Example inputs, not benchmarks."

Then these tables:

1. Data check
2. Scored scenario (inputs, monthly bookings, vacancy lost, ramp lost, total lost, hard costs, base saved, net cash, lost GP, economic cost)
3. Team year (departures, annual lost bookings, annual economic cost)
4. Levers: vacancy 3 vs 2 vs 1 at the current ramp, and ramp minus one month at the current vacancy
5. Retention break-even: spend up to economic cost per departure to keep one AE
6. Assumptions, each labeled as an assumption, including: linear ramp at 50% average; base only during vacancy; inherited pipeline not credited; quota realism and ramped capacity live on their own playbooks.

If you can create files, offer the scored row as a CSV download.

## EXAMPLE DATA (fictional, for testing this prompt)

Use this only when the user says "run the example". The company and plans are made up. Every figure is an example input to replace, not an attrition, vacancy, or ramp benchmark.

- Score 2026-plan
- Annual quota $800,000
- Tenured attainment 80%
- Vacancy 3 months
- Ramp 5 months, linear (average 50% productivity)
- AE base salary $80,000
- Recruiting fee 20% of base
- Onboarding / enablement $5,000
- Gross margin 75%
- Team size 10 AEs
- Annual AE attrition 30%

Scenarios:

```csv
scenario,quota,attainment_pct,vacancy_months,ramp_months,base_salary,recruiting_fee_pct,onboarding,gross_margin_pct,team_size,attrition_pct
2026-east,700000,75,4,6,75000,20,4000,70,8,25
2026-plan,800000,80,3,5,80000,20,5000,75,10,30
2026-plan,800000,80,3,5,80000,20,5000,75,10,30
BAD-1,0,80,3,5,80000,20,5000,75,10,30
,800000,80,3,5,80000,20,5000,75,10,30
```

How to run it

  1. Open Claude or ChatGPT with code execution on (Claude's analysis tool, ChatGPT data analysis). Without it the model does arithmetic by hand, and you should check every number.
  2. Paste the prompt. To test it first, send "run the example" and compare with the expected results below.
  3. Attach a CSV of plans with scenario, quota, attainment_pct, vacancy_months, ramp_months, base_salary, recruiting_fee_pct, onboarding, gross_margin_pct, team_size, and attrition_pct. The prompt lists the columns.
  4. Read the data check first. Take economic cost per departure, the lever table, and the retention break-even to the stay-package or req review. Keep every figure labeled as an example input, not an attrition or ramp benchmark.

Before you paste quota, salary, and attrition

Comp, attrition, and team size are commercially sensitive. Check your company's AI and data policy, prefer a business or enterprise plan, and drop names: the prompt only needs scenario ids and amounts. It reads the extract and changes nothing in HRIS, ATS, payroll, or the CRM.

Expected results on the example data

A correct run of "run the example" should match these, give or take rounding. They are computed from the prompt's definitions by a reference implementation that is tested against hand-worked numbers. The data is fictional.

Data check
5 rows; kept 2026-east, 2026-plan; left out: 2026-plan (duplicate scenario), BAD-1 (Enter an annual quota above zero.), (blank scenario) (no scenario id)
Lost bookings
$53,333.33 /mo; vacancy $160,000.00; ramp $133,333.33; total $293,333.33
Economic cost
$221,000.00 per departure ($220,000.00 GP + $1,000.00 net cash); 3.0 leavers; $663,000.00 /yr
Vacancy-month lever
$53,333.33 bookings and $33,333.33 economic ($40,000.00 GP minus $6,666.67 base)
Expected vacancy and ramp levers
ScenarioVacancyRampLost bookingsEconomic cost
Current35$293,333.33$221,000.00
Vacancy 2 mo25$240,000.00$187,666.67
Vacancy 1 mo15$186,666.67$154,333.33
Ramp 4 mo34$266,666.67$201,000.00

Monthly $53,333.33. Vacancy $160,000. Ramp $133,333.33. Total $293,333.33. Economic $221,000. 3.0 leavers, $880,000 / $663,000 a year. Vacancy month $33,333.33. Example inputs, not benchmarks.

AE attrition cost (vacancy, ramp, lost bookings)

What one AE departure costs: bookings missed while the seat is empty, bookings missed while the replacement ramps linearly at 50% average productivity, cash recruiting and onboarding net of base not paid during vacancy, and the gross profit on those bookings. Every field is an example input to replace. Prefilled with the fictional example.

Monthly bookings
$53,333.33
$800,000 / 12 x 80%
Lost in vacancy
$160,000
3 mo x $53,333.33
Lost in ramp
$133,333.33
5 mo x 50% x monthly
Lost bookings / departure
$293,333.33
Vacancy + ramp
Hard costs
$21,000
Recruiting $16,000 + onboarding
Base saved in vacancy
$20,000
$80,000 / 12 x 3
Net cash cost
$1,000
Hard costs minus base saved
Lost gross profit
$220,000
$293,333.33 x 75%
Economic cost / departure
$221,000
Lost GP + net cash
Departures / year
3.0
10 x 30%
Annual lost bookings
$880,000
3.0 x lost bookings
Annual economic cost
$663,000
3.0 x economic cost

Vacancy and ramp levers

Same quota, attainment, salary, fee, onboarding, and margin. Vacancy 3 vs 2 vs 1 month at the current ramp, then one fewer ramp month at the current vacancy. Each vacancy month removed saves $53,333.33 bookings and $33,333.33 net economic cost ($40,000 GP minus $6,666.67 base).

ScenarioVacancyRampLost bookingsEconomic costSaved vs current
Current (example)35$293,333.33$221,000current
Vacancy 2 mo25$240,000$187,666.67$53,333.33 bookings, $33,333.33 economic
Vacancy 1 mo15$186,666.67$154,333.33$106,666.67 bookings, $66,666.67 economic
Ramp 4 mo34$266,666.67$201,000$26,666.67 bookings, $20,000 economic

Retention break-even. Spending up to $221,000 to keep one AE (stay, counter, extra enablement) breaks even against replacing them on these example inputs.

What this attrition math leaves out

  • Linear ramp. Average 50% productivity from start to full quota. A front-loaded or back-loaded curve will change the ramp line. That is an assumption, not a measured ramp.
  • Base only during vacancy. Variable, benefits, employer tax, and manager time are out. You also do not get inherited pipeline credited back. This is vacancy and ramp vs bookings, not fully loaded cost of attrition.
  • Example inputs. Quota, attainment, vacancy, ramp, fee, and attrition are fictional placeholders. Replace them with your HRIS, ATS, and CRM.

Vacancy and ramp vs bookings on one AE seat, not a headcount plan. Ramped capacity across the year is on the ramp-capacity playbook. Whether the quota itself is realistic is on quota attainment. OTE vs bookings on a live plan is on sales comp cost of sales. Every default is an example input, not a benchmark.

Implementation steps

  1. 1

    Write the definitions down with finance and sales ops before pulling numbers: quota is annual bookings for one AE; tenured attainment is expected bookings / quota for a ramped AE; vacancy months is time to backfill; ramp months is start to full productivity, treated as linear so average productivity during ramp is 50%; base salary is annual base, not OTE; recruiting fee is a percent of that base; onboarding is one-time enablement; gross margin is contribution on bookings; team size and annual attrition scale the seat to the year. Every figure is an input you replace, not an attrition benchmark. Ramped capacity across a year is a different question, on the ramp-capacity playbook; whether quota is realistic is on the quota-attainment playbook; OTE vs bookings on a live plan is on the sales-comp playbook

  2. 2

    Collect one row per team plan. Drop rows with a missing scenario id, a duplicate scenario, a quota of zero, a team size of zero, a percent outside 0% to 100%, or a negative vacancy, ramp, salary, or onboarding cost, and list each dropped row

  3. 3

    Expected monthly bookings = quota / 12 x attainment. Lost bookings during vacancy = vacancy months x monthly. Lost bookings during ramp = ramp months x 0.5 x monthly. Total lost bookings = vacancy + ramp. In the fictional example $800,000 quota, 80% attainment, 3 months vacant, 5 months ramp: monthly $53,333.33, vacancy $160,000, ramp $133,333.33, total $293,333.33. Round money to two decimals

  4. 4

    Recruiting = fee% x base. Hard costs = recruiting + onboarding. Base saved during vacancy = base / 12 x vacancy months. Net cash = hard costs - base saved. Lost gross profit = total lost bookings x margin. Economic cost per departure = lost GP + net cash. In the fictional example 20% of $80,000 + $5,000 = $21,000 hard costs, $20,000 base saved, $1,000 net cash, $220,000 lost GP, $221,000 economic cost. Only base is skipped during vacancy; variable, benefits, and manager time are out

  5. 5

    Departures per year = team size x attrition. Annual lost bookings and annual economic cost multiply the per-departure figures by that count. In the fictional example 10 AEs x 30% = 3.0 departures, $880,000 lost bookings, $663,000 economic cost. Round departures to one decimal

  6. 6

    Show vacancy 3 vs 2 vs 1 month at the current ramp, and one fewer ramp month at the current vacancy. Each vacancy month removed saves one month of tenured bookings and monthly GP minus one month of base (in the fictional example $53,333.33 bookings and $33,333.33 net economic: $40,000 GP minus $6,666.67 base). Spending up to the economic cost per departure to keep one AE breaks even against replacing them on these inputs

  7. 7

    Run it with the copy-paste prompt on this page in Claude or ChatGPT, or with formulas in the template, and use the calculator on this page to test other quotas, vacancy, ramp, fees, and attrition. Share economic cost per departure, the lever table, and the retention break-even with finance; this is seat math, not a headcount vote and not a stay-bonus policy

  8. 8

    Rerun when quota, attainment, vacancy, ramp, fee, or attrition changes, and store the ten inputs so a longer empty seat shows up before the req is delayed

Template outline

The structure to recreate in your own workspace. Field names and thresholds are starting points.

Google Sheet: AE attrition cost FYxx (finance owns margin; sales ops owns quota and attainment; HR owns vacancy, ramp, and attrition)

Tab inputs: score_scenario

Tab plans (one row per team plan):
  scenario, quota, attainment_pct, vacancy_months, ramp_months, base_salary, recruiting_fee_pct, onboarding, gross_margin_pct, team_size, attrition_pct
  kept = unique scenario AND all fields are numbers AND quota > 0 AND team_size > 0
    AND percents in [0, 100] AND vacancy_months, ramp_months, base_salary, onboarding >= 0

Tab cost:
  monthly_bookings = quota / 12 x attainment_pct / 100
  vacancy_lost = vacancy_months x monthly_bookings
  ramp_lost = ramp_months x 0.5 x monthly_bookings
  total_lost = vacancy_lost + ramp_lost
  recruiting = recruiting_fee_pct / 100 x base_salary
  hard_costs = recruiting + onboarding
  base_saved = base_salary / 12 x vacancy_months
  net_cash = hard_costs - base_saved
  lost_gp = total_lost x gross_margin_pct / 100
  economic = lost_gp + net_cash
  departures = team_size x attrition_pct / 100
  annual_lost = departures x total_lost
  annual_economic = departures x economic
  vacancy_month_economic = monthly_bookings x margin - base_salary / 12

Tab levers (vacancy 3, 2, 1 at current ramp; ramp minus 1 at current vacancy):
  same formulas, vacancy_months or ramp_months from the row

Worked example (example data, fictional): score 2026-plan
  5 rows read, 2 kept (2026-east and 2026-plan). Left out: 2026-plan listed twice; BAD-1 quota 0; blank scenario.
  $800,000 quota, 80% attainment, 3 mo vacant, 5 mo ramp, $80,000 base, 20% fee, $5,000 onboarding, 75% margin, 10 AEs, 30% attrition.
  Monthly $53,333.33. Vacancy $160,000. Ramp $133,333.33. Total lost $293,333.33.
  Hard costs $21,000. Base saved $20,000. Net cash $1,000. Lost GP $220,000. Economic $221,000.
  3.0 departures. Annual lost $880,000. Annual economic $663,000.
  Vacancy 2 mo: $240,000 lost, $187,666.67 economic (save $53,333.33 / $33,333.33).
  Ramp 4 mo: $266,666.67 lost, $201,000 economic (save $26,666.67 / $20,000).
  Retention break-even: spend up to $221,000 to keep one AE.
  Inputs are examples to replace, not benchmarks.
  Linear ramp at 50% average is an assumption. Base only during vacancy.

Calculator on this page, prefilled: $800,000, 80%, 3, 5, $80,000, 20%, $5,000, 75%, 10, 30%. Every money line above matches.

Slack to #finance-revenue before a stay package or a delayed req:
"AE attrition cost ({{scenario}}): {{economic}} per departure on {{lost}} bookings ({{gp}} GP, {{cash}} net cash).
 {{departures}} expected leavers: {{annual_economic}} this year. One vacancy month is {{month_economic}}.
 Break-even stay spend {{economic}}. Vacancy and ramp vs bookings, not fully loaded. Sheet: {{sheet_url}}"

Tab history: scenario, quota, vacancy, ramp, lost_bookings, economic, departures, annual_economic

Cost, time saved, and break-even

Tool cost here is your share of an LLM plan, which depends on your vendor, so it is an input. Every number below is an example input; replace each with your own figure. Hours saved are estimates, not measured results. The quota, attainment, vacancy, ramp, salary, fee, and attrition in the calculator are also example inputs, not benchmarks.

Inputs (all assumptions)

Replace each value with your own figure.

  • THours a quarter to pull quota, attainment, vacancy, ramp, salary, fee, onboarding, margin, team size, and attrition and size the seat by hand4AssumptionTime the next three attrition or stay-package reviews.
  • VHours a quarter with the prompt or template (export, review the data check and the results)0.8AssumptionTime the first two quarterly runs, then multiply by three for the quarter.
  • RLoaded hourly cost of the finance or RevOps analyst$75AssumptionSalary plus benefits, divided by working hours.
  • KMonthly tool cost for the LLM plan$20AssumptionYour share of the Claude or ChatGPT plan, from current vendor pricing and your invoices; Google Sheets, the CRM, HRIS, and Slack are usually already paid for.

Formulas

Time saved per quarter (estimate)T - V
4 - 0.8 = 3.2 hours
Time saved per week (estimate)(T - V) / 13
3.2 / 13 = 0.2 hours
Value of time saved per quarter (estimate)(T - V) x R
3.2 x $75 = $240
Tool cost per quarterK x 3
$20 x 3 = $60
Break-even hours per quarter (estimate)K x 3 / R
$60 / $75 = 0.8 hours, so the run covers its tool cost once it saves 48 minutes a quarter
Economic cost (fictional example data)lost bookings x margin + recruiting + onboarding - base saved in vacancy
$293,333.33 x 75% + $21,000 - $20,000 = $221,000 per departure; $663,000 a year at 3.0 leavers
  • The time math counts analyst time only and is an estimate. A stay package or a faster req is a much larger number, but that decision is yours, so it is not added to the time savings.
  • Rounded dollars are not a payroll file. Recheck when quota, vacancy, ramp, or attrition changes.
  • Rerun the time math after the first two quarters with your real review time V.

Common questions

How do you compute the cost of one AE departure?
Lost bookings = vacancy months x monthly tenured bookings, plus ramp months x 50% x monthly bookings. Economic cost = lost bookings x gross margin, plus recruiting and onboarding minus base salary not paid during vacancy. In the fictional example $800,000 quota at 80%, 3 months vacant and 5 months ramp: $293,333.33 lost bookings and $221,000 economic cost.
Why is ramp counted at 50% productivity?
The sheet treats ramp as linear from 0 to 100%, so average productivity during ramp is half. In the fictional example 5 months x 50% x $53,333.33 = $133,333.33 lost bookings. A front-loaded or back-loaded curve will change that line; replace the assumption with your own ramp.
What does cutting vacancy by one month save?
Each vacancy month removed saves one month of tenured bookings and monthly gross profit minus one month of base, because you start paying that salary again. In the fictional example $53,333.33 bookings and $33,333.33 net economic cost ($40,000 GP minus $6,666.67 base).
How much can you spend to keep an AE before replacing them is cheaper?
Spending up to the economic cost per departure breaks even against replacing them on these inputs. In the fictional example that ceiling is $221,000. Variable comp, benefits, and manager time are out, so a fully loaded number would be higher.
How much time does it save?
With the example inputs, building the comparison by hand takes 4 hours a quarter and reviewing the prompt or template run takes 0.8, so 3.2 hours a quarter are saved, about 0.2 hours a week. That is an estimate, worth $240 a quarter at $75 an hour against an example $60 a quarter LLM plan share.

Same kind of money math, with the formulas shown. Each opens in the browser with example inputs you replace.

Need help implementing a playbook?

Our team builds custom Clay workflows and AI automations for revenue teams.

Get it built for you